The final pieces of the scaffolding have now been installed and covered, to prevent anything from falling on those below during works.



The construction team have begun laying the flooring.  This appears to be made up of concrete beams and tiles.  The beams have been installed using a large crane and lowering them in through the roof spaces to the ground space below.  progress on this stage is quite rapid.