In this picture you can see a pipe connecting the building with the drains, which will eventually be underneath the whole new building.
The walls to the upper foundations are now being erected on top of the concrete footings. You can now get a better feel of the size of the building.
Next steps - laying the concrete flooring.
Comments
Post a Comment